Skip to content
SWIFT HORIZON
Menu
Illustrative reference of a low residence set in open grassland

The path

From first conversation to first revenue.

Five phases, a five-year operating lock-in, and a 70 / 30 share settled monthly. The path is the same for every capsule across Greater Accra, Kumasi, Western and Northern.

A guided conversation, not a public sales funnel.

IFive phases

  1. IPhase 1

    Land & permits

    Title verified under Ghanaian land law, permits secured, and the site prepared.

  2. IIPhase 2

    Foundation

    Ground works and the structural base that every capsule sits on.

  3. IIIPhase 3

    Delivery

    The P7 capsule arrives: 38 m², nine-layer wall system, solar-ready.

  4. IVPhase 4

    Installation & finish

    Interiors, services, and the walkthrough that makes it a home.

  5. VPhase 5

    Revenue

    Stays open on the market — and the 70 / 30 settlement starts.

IIThe lock-in

Five years of one operating partner.

Every capsule is operated by Swift Horizon for five years from first revenue. That is what makes the split legible — one operator, one ledger, one settlement.

See the protections

Lock-in
5 years
Operator
Swift Horizon
Share
70 / 30
Settlement
Monthly · USD held, GHS settled
After the lock-in
Renew, or take full control

Next step

Walk the five phases in a briefing.

Request a briefing